NHCRWA Spears Road Regional Pump Station Improvements
Construction improvements includes the installation of a 36-inch water line inlet and discharge flow meter run and tie-in to existing lines, a water softening system, a permanent caustic feed system, installation of actuators, upgrading the access road, and installation of a utility trench system.
Details
Location
Houston, TX
Cost
$7,635,000
Size
957,000 SF
Completion
February 2023
Owner
North Harris County Regional Water Authority (NHCRWA)
Architect
AECOM
Role
Prime Contractor
Delivery Method
General Contracting